Consider four number of substation, Substation A, Substation B, Substation C, Substation D. Here Substation A is generation station and B, C and D are distribution stations. In this, if the fault (short circuit or earth fault) occurs in Substation D means, the substation D relay has to operate, instead of that, the substation A relay operated means such system said to be poor relay coordinated power system. It causes the total power system shutdown or unnecessary zone trips. Because, there is no fault on substation A, B and C but the substation A operates unnecessarily. In order to avoid such relay operation, we have to set co-ordination between all 4 substations..
We are a team of Certified Chartered Engineers for Electrical Engineering Division with more than 10 years of experience in Engineering for different types of industries and also undertake Electrical Engineering Activities for Green Field as well as Brown Field Projects, Power Quality Audit for Existing Plant, Harmonic Analysis for Plant, Inspection of Electrical Equipments at Manufacturers.
Projects Done
Happy Clients
Years Of Experience
Crazy Thinkers